In mid-July, you close your laptop for three weeks. The autoresponder is on, the last email is sent, and you drive off thinking your portfolio is on pause. It isn't. Somewhere in those three weeks, a pipe leaks, a boiler breaks down, or a tenant locks themselves out. The question isn't whether it happens, but who the tenant gets on the phone.
An emergency repair doesn't care about your holiday schedule. The tenant sitting without water on a scorching Tuesday won't wait patiently until you're back behind your desk in mid-August. They call, and if they can't reach anyone, they call someone else. That's exactly the moment a manageable report turns into a case file.
The frustrating part is that this comes back every year and can't be solved with "just plan ahead properly". You can postpone maintenance, but you don't choose when something breaks down. And precisely during the period you're away, your regular contractor often is too.
Your contractor is on holiday too
In 2026, the bouwvak (the Dutch construction industry's collective summer shutdown) doesn't fall in a single week but shifts across more than a month depending on the region. In the northern region, the bouwvak runs from 20 July to 7 August, in the southern region from 27 July to 14 August, and in the central region from 3 to 21 August. Add the individual holidays of self-employed engineers on top of that, and your regular maintenance partner has limited availability for a large part of the summer.
So the gap isn't only on your side. The moment a tenant reports an emergency repair, you might be away and your standard contractor might just have gone into the bouwvak. Who picks up the phone then, and who can actually come round, isn't a detail. It's the core of your summer planning.
What happens if nobody picks up the emergency repair
A tenant who can't reach you has more options than you might think. For a genuinely urgent defect, a burst pipe or a heating failure, they don't have to formally put you in default first, according to the Dutch government. In an urgent case, they're allowed to arrange a repair themselves and recover the costs from you. The Woonbond (the Dutch tenants' association) also actively points tenants towards that route. Your unreachability doesn't decide whether action gets taken, only who chooses the engineer and at what rate.
Since 2024, there's been a second exit. Every municipality has a meldpunt goed verhuurderschap (a local reporting point for landlord conduct, set up under the Wet goed verhuurderschap, the Dutch law on responsible landlordship) where a tenant can lodge a complaint about their landlord, and these reports go through to the municipality within two working days. A tenant who can't get hold of anyone for three days about a leak therefore has a low-threshold place to make their dissatisfaction official. A report you could have caught in five minutes suddenly ends up with the municipality.
Set the escalation plan before you leave
The solution isn't setting up an expensive 24-hour service, but recording a short decision in advance that your colleague or an external call centre can carry out without you. Three things make the difference.
Agree who handles the first line and with what mandate. A stand-in who's only allowed to note things down and pass them on solves nothing. Give them the authority to bring in a contractor directly, up to an agreed amount, for a defined list of emergencies: leaks, no hot water, no power or a blocked front door.
Record which contractor may come round straight away for which type of report, with a second name in case the first is in the bouwvak. Without that second name, your stand-in is still left empty-handed.
Finally, decide when a tenant can simply wait until Monday, and when you want to be called yourself. Not every report is urgent, and not every urgent case needs to land on your desk. The difference between a relaxed holiday and a phone ringing on the beach lies in how sharply you draw that line beforehand.
What a tenant remembers isn't that you were away for three weeks. It's whether someone picked up when things went wrong. An emergency repair that gets handled properly on day two of your holiday, by someone who knew what they were allowed to decide, costs you a text message. The same report without a prior arrangement costs you a dissatisfied tenant, an unfamiliar invoice, and in the worst case, a line in the municipal reporting point. The only difference is a decision tree you put on paper before you leave.
See what automatic ticket handling feels like
We are almost ready to let in our first property managers and owners' associations. Leave your details and we will be in touch the moment we open up.
Already have an account? Log in



